Changing the Run Duration

Open the Project Settings dialog window as described in Editing Project Settings above.  Click the Runtime tab and, in the Time Settings area, enter a new Duration of Run time in seconds. Click the OK button to save changes and exit the Project Settings dialog.

 

 

The run duration may also be varied through the equivalent field in the Project tab of the ribbon control bar.